2011-Present

  • 2017.05  Developed Combined Cycle Power Plant Operation Simulator

  • 2016.05  Established Overseas Office in Dubai

  • 2016.03  Awarded Main Power System Performance Test Contract for Barakah Nuclear Power Plant (NPP) in UAE

  • 2016.02  Awarded Radioactive Environmental Qualification System Contract for Shin-Kori NPP Units 1 & 2 and Shin-Wolsong
                   NPP Units 1 & 2

  • 2014.03  Awarded Power Plant Asset Management System Contract for Samcheok Green Thermal Power Plant Units 1 & 2

  • 2013.01  Acquired Consulting Certification for Environmental Business (Ministry of Environment)

  • 2012.12  Awarded Quality Surveillance Contract for Construction and Equipment Manufacturing for Barakah NPP in UAE

  • 2012.07  Established Manufacturing Facility at Kijang-gun, Busan

  • 2011.12  ISO 14001 Certified


2001-2010

  • 2010.12  Awarded Radioactive Environmental Qualification System Contract for KHNP Hanbit NPP Units 5 & 6

  • 2010.11  Acquired Business License for Mechanical Construction Works

  • 2008.05  Established Manufacturing Facility at Daeduk Innopolis, Daejeon

  • 2007.11  Contracted with Korea Hydro & Nuclear Power for the Simulator Operation & Test Order for Advanced Power Reactor
                   1400 Nuclear Power Plant

  • 2007.11  Secured the Qualification of INNO-BIZ(Innovation & Business) (Korea Small & Medium Business Administration)

  • 2007.04   ISO 9001 Certified

  • 2007.02  Acquired Business License for Electrical Construction Works

  • 2006.08  Awarded Feasibility Study Contract for 100MW Hydro Power Plant in Georgia

  • 2006.08  Established Busan Operation Center at Kijang-gun, Busan

  • 2005.08  Acquired the Qualification of Technology-Venture Business (Korea Small & Medium Business Corporation)

  • 2004.09  Awarded Quality Surveillance Contract for Construction and Equipment Manufacturing for Shin-Kori NPP Units 1 & 2
                   and Shin-Wolsong NPP Units 1&2

  • 2003.11  Awarded Power System Performance Test Contract for Hanbit Nuclear Power Plant Units 1, 2, 3 & 4

  • 2001.11  Established Research Center in Daeduk Operation Center

  • 2001.10  Established Daeduk Operation Center at Daeduk Innopolis, Daejeon

  • 2001.09  Awarded PSR (Periodic Safety Review) Contract for KHNP Wolsong Nuclear Power Plant Unit 1



1999-2000

  • 2000.09  Awarded KHNP Kori Nuclear Unit 1 Performance Analysis Contract

  • 2000.05  Acquired J&L Company and renamed HANVIT Power Services Inc.

  • 2008.05  Registered Engineering Business to Korea Engineering & Consulting Association (KENCA)

  • 2000.02  Contracted with Korea Hydro & Nuclear Power for the Simulator Operation & Test Order for Advanced Power Reactor
                   1400 Nuclear Power Plant

  • 1999.10  Awarded Service Contract for GS Dangjin CCPP Commissioning

  • 1999.06   Nuclear Engineering Inc. established